Brandeis University Battery
FirstLight’s Brandeis University Battery, along with a second system at UMass Dartmouth, is the company’s first battery storage system. The project is a behind-the-meter battery that lowers peak electricity costs for the university while simultaneously improving reliability and decreasing the school’s carbon footprint.
Location: Waltham, MA Storage Type: Lithium Ion Battery Storage Capacity: 780 kW / 1.6 MWh Storage Technology: Tesla Powerpack 2.1 Originally Built: 2019
